24/7 dispatch · Premium communities across Dubai
054 372 5512
← All projects
Industrial rooftop AC condenser units and HVAC plant room in Dubai

HVAC Engineering

Corporate AC & HVAC System Overhaul

Full systemic HVAC maintenance and industrial motor replacement for a Dubai Marina residential tower. Focused on restoring peak cooling efficiency.

Challenge

The facility management of a high-rise residential tower in Dubai Marina reported chronic cooling failures and surging energy costs.

Solution

Khan Saab HVAC specialists conducted a multi-point thermal and pressure diagnostic of the primary chilled water circuits. We discovery cavitation in the primary pump motors.

Technical audit of HVAC electrical control panels and circuit breakers

Project Proof

On-site Documentation

Plan something similar?

Use the quote form with the closest trade pre-selected, or call us for a same-day technical triage.