HVAC Engineering
Corporate AC & HVAC System Overhaul
Full systemic HVAC maintenance and industrial motor replacement for a Dubai Marina residential tower. Focused on restoring peak cooling efficiency.
Challenge
The facility management of a high-rise residential tower in Dubai Marina reported chronic cooling failures and surging energy costs.
Solution
Khan Saab HVAC specialists conducted a multi-point thermal and pressure diagnostic of the primary chilled water circuits. We discovery cavitation in the primary pump motors.
Project Proof
On-site Documentation
Plan something similar?
Use the quote form with the closest trade pre-selected, or call us for a same-day technical triage.